Skip to content

Metrics & risk matrix ​

Configures the scales of the EBIOS RM study: risk levels, likelihood, severity, and the matrix that crosses them.

Scope

These scales are specific to the EBIOS RM module. The IEC 62443 module has its own metrics, and Industrial Risks has its own too. In a multi-method project, the three coexist without synchronising.

Four tabs ​

TabContent
Risk levelsPossible outcomes of the matrix — used throughout the study
LikelihoodHorizontal axis of the matrix; used in scenarios and calculations
SeverityVertical axis; used in feared events and calculations
MatrixLikelihood × Severity crossing

Each level carries a value, a label, a description and a colour, with a preview.

Setting the matrix ​

Click a cell to change the risk level associated with the Likelihood × Severity crossing. The Auto-fill button applies a consistent progression across the whole grid, to be adjusted afterwards.

The matrix stays empty as long as likelihood and severity levels are not defined.

Reset ​

The Reset button restores the whole matrix to the EBIOS RM default values, after confirmation.

Changing a scale mid-study

Changing the levels or the matrix re-rates the whole study: feared events, scenarios, risk summary and residual risks. Do this at the start, not after Workshop 5.

Polyodos — Documentation utilisateur