1What is a PHA?
The Preliminary Hazard Analysis (PHA; analyse préliminaire des risques, APR, in French) is a method for systematically identifying the hazards of a facility, carried out early in the life cycle of the project or of operations. It sweeps each system or piece of equipment to list what could go wrong, without aiming for the exhaustiveness of an FMECA or the quantitative precision of a LOPA. It is a structured first pass, often the entry point to more detailed methods for the most critical scenarios.
The method comes from US military and aerospace programmes of the 1960s, where it appears in the system safety standard MIL-STD-882. It then spread to the chemical industry, nuclear, rail and the process industries.
2When to use a PHA
- At the design stage, before detailed drawings exist: the PHA guides architecture choices and identifies hazards to eliminate at source.
- On an existing facility, to draw up an initial risk inventory or prepare a regulatory study.
- Before a change (new product, new equipment, process change), to pin down what changes.
- To prioritise: the most critical scenarios are then examined in depth with HAZOP, FMECA, a fault tree or a bow-tie.
The PHA is less suited to detailed analysis of a continuous process (where the more systematic HAZOP is preferable) or to studying the reliability of a component (the domain of FMECA).
3Definitions
| Term | Definition |
|---|---|
| Hazard | An intrinsic property of equipment or a substance that can cause harm (e.g. “stored mechanical energy”, “toxic product”, “electrical voltage”). The hazard exists independently of any incident: it is a potential, not an event. |
| Undesired event | The abnormal situation through which the hazard would materialise (e.g. “rupture of the pump casing”). It is the tipping point from potential to incident. |
| Cause | What can lead to the undesired event (e.g. “prolonged cavitation”, “internal corrosion”). |
| Consequence | What results from the undesired event if it occurs (e.g. “metal fragments ejected”, “flooding of the room”). |
| Risk | The combination of the severity of a consequence and its probability of occurrence. |
In practice, the Hazard field is often filled in by broad category, to make sorting and statistics easier: mechanical (rupture, ejection, crushing), chemical (leak, toxicity, reaction), electrical (short circuit, electric shock), thermal, ergonomic… A list of generic hazards serves as a checklist so that nothing is forgotten.
4Before you start: model the system
Like FMECA, the PHA relies on a prior breakdown of the facility into systems and equipment — see the cross-cutting topic Facility modelling, shared by PHA, FMECA, HAZOP and bow-tie. Also gather the input documents: drawings, block diagrams, product safety data sheets, operating experience and accidents on similar facilities.
5The PHA step by step
- Define the scope and build the working group: facility boundaries, life phases covered (normal operation, start-up, maintenance…), participants.
- Break down the facility into systems or equipment (see modelling above).
- Identify the hazard carried by each piece of equipment (energy, substance, movement…).
- Describe the undesired event: the abnormal situation through which the hazard would materialise.
- List the causes that could lead to this event.
- List the potential consequences (human, environmental, material).
- Rate the scenario for severity and probability, before measures (see next section).
- List existing and planned measures, then re-rate the scenario after measures.
- Prioritise and decide: action plan, scenarios to examine further with a more detailed method.
6Rating risk in a PHA
The general principles of risk rating (matrix, scales, before/after measures) are common to all methods — see the cross-cutting topic Rating a risk. There is no standardised scale for the PHA: each organisation defines its own. The example below crosses two metrics rated from 1 to 4, the default scale in Polyodos.
Severity
| Level | Label | Meaning |
|---|---|---|
| 1 | Negligible | First aid, no lost time |
| 2 | Significant | Temporary partial incapacity < 3 days |
| 3 | Serious | Permanent partial incapacity, hospitalisation > 1 day |
| 4 | Catastrophic | Death or permanent total incapacity |
Probability (likelihood)
| Level | Label | Indicative frequency |
|---|---|---|
| 1 | Very unlikely | < 10⁻⁴ / year |
| 2 | Unlikely | 10⁻⁴ – 10⁻² / year |
| 3 | Likely | 1 possible occurrence per year |
| 4 | Frequent | Several occurrences expected |
Criticality matrix
Criticality results from crossing severity × probability on a configurable matrix; the level obtained is read on a 4-step scale:
| Level | Label | Meaning |
|---|---|---|
| 1 | Acceptable | Stay vigilant |
| 2 | To be monitored | Planned treatment |
| 3 | Not acceptable | Treatment required in the short term |
| 4 | Unacceptable | Urgent treatment, shutdown if necessary |
7Existing measures and planned measures
Each scenario distinguishes existing measures (already in place, taken into account in the before-measures rating, often empty if the scenario is not yet covered) from planned measures (action plan, whose implementation justifies the after-measures rating). The same prevention / protection distinction as in FMECA applies:
| Type | Acts on | Examples |
|---|---|---|
| Prevention | Probability | Periodic vibration monitoring, visual inspection, preventive replacement of wear parts, procedure governing a hazardous operation (permit to work) |
| Protection | Severity | Gas detector with alarm and automatic shut-off, residual-current circuit breaker, thermal protection, retention |
8Example: a drinking-water treatment plant
The Polyodos demonstration data set (drinking-water treatment plant, fictitious data) covers 4 scenarios across the Pumping, Chemical treatment and Storage systems:
| # | System / Equipment | Hazard | Causes | Undesired event | Consequences | S | P | C | Planned measures | S' | P' | C' |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Pumping — Centrifugal pump P-101 | Mechanical | Prolonged cavitation, excessive vibration, internal corrosion | Rupture of the pump casing | Metal fragments ejected, flooding of the pump room, production stoppage | S4 | P2 | R3 | Monthly vibration monitoring (piezoelectric sensors), replacement of mechanical seals every 2 years | S3 | P1 | R2 |
| 2 | Chemical treatment — Chlorine tank CL-301 | Chemical | Corrosion of the HDPE wall, rupture of the filling connection, overpressure during unloading | Liquid chlorine leak | Toxic atmosphere (chlorine gas), severe respiratory irritation, site evacuation | S5 | P2 | R? | Chlorine detector with audible alarm and automatic shut-off, unloading procedure under permit to work, annual tank inspection | S4 | P1 | R2 |
| 3 | Pumping — Electric motor M-101 | Electrical | Wiring degraded by humidity, prolonged motor overload, circuit breaker fault | Short circuit with switchboard fire | Fire in the electrical room, loss of power to pumping, risk of electric shock | S3 | P2 | R2 | Annual periodic inspection of the electrical installation, 30 mA residual-current breaker and motor thermal protection | S2 | P1 | R1 |
| 4 | Storage — Treated-water tank CS-301 | Mechanical | Ageing of the reinforced concrete, differential ground settlement, hydraulic overpressure | Rupture of the concrete tank (structural crack) | Massive overflow (500 m³), flooding of the downstream area, groundwater contamination | S4 | P1 | R2 | Quarterly visual inspection (cracks, deformation), geotechnical soil survey every 10 years | S3 | P1 | R2 |
Reading the result and action plan
Sorted by before-measures criticality, the worksheet directly gives the order of treatment:
| Priority | Scenario | Before measures | After measures | Decision |
|---|---|---|---|---|
| 1 | Liquid chlorine leak (CL-301) | S5 × P2, outside the matrix | S4 × P1 → R2 | Extend the matrix to severity 5, then examine the scenario further with a bow-tie |
| 2 | Pump casing rupture (P-101) | S4 × P2 → R3 | S3 × P1 → R2 | Measures to be implemented in the short term; vibration monitoring to be added to the maintenance plan |
| 3 | Concrete tank rupture (CS-301) | S4 × P1 → R2 | S3 × P1 → R2 | Residual risk to be monitored: severity remains high, and only a protection measure (retention, downstream warning) could reduce it |
| 4 | Switchboard fire (M-101) | S3 × P2 → R2 | S2 × P1 → R1 | Measures planned, residual risk acceptable |
Of 4 scenarios, 2 must be treated as a priority and 1 warrants a detailed analysis. This example is handled in Polyodos, from worksheet to Word report. See the Industrial risks demo or try Polyodos free for 30 days.
9Common mistakes
| Mistake | Why it is a problem |
|---|---|
| Confusing hazard and undesired event | The hazard is an intrinsic property (“high pressure”), the undesired event an abnormal situation (“tank rupture”): mixing them makes the causes inconsistent. |
| Rating only after measures | Without a before-measures rating, it is impossible to judge how effective the barriers really are or to prioritise the most critical scenarios. |
| Extending a scale without extending the matrix | Adding a customised severity level (e.g. 5) without updating the criticality matrix leaves scenarios with no computable risk level — see the example above. |
| Forgetting transient phases | Start-up, shutdown, maintenance and unloading account for a large share of accidents: a PHA limited to normal operation misses them. |
| Aiming for exhaustiveness at the expense of perspective | The PHA loses its value if it turns into a disguised FMECA: a broad overview is better, with critical scenarios examined in depth afterwards using HAZOP or FMECA. |
10Further reading
Learn: the online courses Industrial risks and Technical and industrial risk analysis on aurorisk.com.
Practise: the Industrial risks module user guide in Polyodos.