1What is fault tree analysis?
A fault tree (FTA, Fault Tree Analysis) starts from a top event, the undesired event to be explained, and breaks it down logically, using AND and OR gates, into basic events: component failures, human errors or external conditions that are not broken down any further.
It is a deductive approach: FMEA starts from components and works up to their effects, whereas FTA starts from the undesired effect and looks for its causes. It produces two results:
- qualitative: the minimal cut sets, i.e. the smallest combinations of basic events that are sufficient to cause the top event;
- quantitative: the probability (or frequency) of the top event, derived from those of the basic events.
The method was developed in the early 1960s at Bell Telephone Laboratories for the safety of the Minuteman missile launch control system, and then spread to aerospace, nuclear and the process industries. The reference standard is IEC 61025 (Fault tree analysis), which sets out its principles, symbols and evaluation methods.
2Events and logic gates
| Element | Role |
|---|---|
| Top event | The undesired event being analysed, at the top of the tree. It must be stated precisely: what, where, and in which system state. |
| Intermediate event | An event that is broken down further into causes. |
| Basic event | A leaf of the tree, to which a probability or a failure rate is assigned. |
| OR gate | The output event occurs if at least one of the inputs occurs. |
| AND gate | The output event occurs only if all the inputs occur: this is the redundancy gate. |
| k-out-of-n gate | The output occurs if at least k of the n inputs occur, for example 2-out-of-3 voting logic. |
3The method, step by step
- Define the top event and the system boundaries: equipment included, operating state, mission time.
- Identify the immediate causes of the top event and connect them with an AND gate (all required) or an OR gate (any one is enough).
- Break down each intermediate cause, level by level, down to basic events for which credible reliability data exist.
- Identify repeated events: the same failure (common power supply, shared sensor) appearing under several branches.
- Extract the minimal cut sets, by Boolean reduction or with an algorithm such as MOCUS.
- Assign a probability to each basic event and calculate the top event probability from the minimal cut sets.
- Rank: contribution of each cut set, importance measures of the basic events, and measures that eliminate first-order cut sets.
4Minimal cut sets and probability calculation
For independent basic events:
- AND gate:
P = P1 × P2 × … × Pn; - OR gate:
P = 1 − (1 − P1) × (1 − P2) × … × (1 − Pn), close to the sumP1 + P2 + … + Pnwhen the probabilities are small.
These formulas can be applied gate by gate only if no event appears twice in the tree. As soon as an event is repeated, you must go through the minimal cut sets: the top event is the union of the cut sets, and its probability is obtained exactly with the inclusion–exclusion (Poincaré) formula, or approximately with the sum of the cut set probabilities (rare event approximation), which gives an upper bound.
5Example: loss of cooling of a reactor
A reactor is cooled by a water circuit fitted with two redundant pumps A and B, supplied by the same electrical switchboard, and a common manual valve on the outlet. Top event: “no cooling flow on demand”. Tree structure:
| Event | Gate | Inputs |
|---|---|---|
| No flow (top) | OR | Both pumps unavailable; V: common valve closed |
| Both pumps unavailable | AND | Pump A unavailable; pump B unavailable |
| Pump A unavailable | OR | PA: failure of pump A; E: loss of the electrical switchboard |
| Pump B unavailable | OR | PB: failure of pump B; E: loss of the electrical switchboard |
Event E appears under both branches. Boolean reduction: (PA + E) × (PB + E) = E + PA × PB. The minimal cut sets are therefore:
| Minimal cut set | Order | Probability | Share of total (approximation) |
|---|---|---|---|
| {V} common valve closed | 1 | 1 × 10-3 | 18% |
| {E} loss of the electrical switchboard | 1 | 2 × 10-3 | 36% |
| {PA, PB} failure of both pumps | 2 | 0.05 × 0.05 = 2.5 × 10-3 | 45% |
| Sum (rare event approximation) | 5.5 × 10-3 | ≈ 100% |
Exact calculation: the three cut sets share no event and are independent, so P = 1 − (1 − 0.001) × (1 − 0.002) × (1 − 0.0025) = 1 − 0.99451 ≈ 5.49 × 10-3 per demand. Here the approximation is very close.
By contrast, a naive gate-by-gate calculation that treated E as two independent events would give 0.0519 per pump, 0.0519² ≈ 2.69 × 10-3 for both pumps, and then ≈ 3.69 × 10-3 for the top event: an underestimate by one third. The lesson of the tree is clear: the pump redundancy is partly cancelled out by their common power supply, a first-order cut set just like the valve.
In Polyodos, the Industrial risks module includes a fault tree editor that calculates the minimal cut sets and the top event probability, and carries them into the Word report. See the Industrial risks demo or try Polyodos free for 30 days.
6Common mistakes
| Mistake | Why it is a problem |
|---|---|
| Swapping AND and OR gates | An AND gate used instead of an OR gate greatly underestimates the top event probability: the logic of each gate must match how the system actually works. |
| Calculating gate by gate despite repeated events | The same basic event under several branches is not independent of itself: the calculation must go through the minimal cut sets, as the example shows. |
| Overlooking common causes | Two redundant components of the same model, with the same maintenance and the same environment, can fail together. Not modelling this makes the redundancy look too optimistic. |
| Breaking down to an irrelevant level | Going too deep buries the tree in details with no reliable data: stop at the level where a credible probability can be assigned. |
| Poorly defined top event | “System failure” cannot be broken down cleanly. A precise event, in a defined state, gives a readable tree and a useful calculation. |
7Further reading
Learn: the online courses Industrial risks and Dynamic dependability on aurorisk.com.
Practise: the user guide for the Industrial risks module of Polyodos.